STROBELL AFRICA
Login
0700000000
info@depotsystem.com
Transport & Bridges

Mombasa Transport Expressway

Civil engineering design review, bridge piling inspection and high-load asphalt density testing across the coastal corridor.

Kenya National Highways Authority Mombasa County 2022 — 2024 Completed
18.4 km
Corridor length
340
Foundations verified
On programme
Delivered
Project Overview

About this project

The coastal expressway package combined elevated bridge structures with heavy-duty pavement designed for sustained container freight loading. Strobell Africa provided the independent engineering review and the materials verification regime for both.

On the structures side our engineers reviewed the pile design against the geotechnical investigation, then witnessed and logged pile integrity testing across every foundation in the elevated section. On the pavement side we ran nuclear density and core testing on each asphalt lift, with rolling patterns adjusted on the basis of same-shift results.

The project closed on programme with the full materials dossier handed over as a searchable digital archive — every certificate traceable to a specimen, a chainage and a date.

What we delivered

  • Independent review of pile and abutment design
  • Pile integrity testing witness and reporting
  • Asphalt density and core testing per lift
  • Digital materials dossier at handover
Expert Consultation

Planning something similar?

Talk to the team that delivered this one. Free initial consultation, no obligation.