Heavy structural foundation inspection, concrete mix design assessment and a standing materials QA programme for an operating mine.

Base Titanium Limited Kwale County 2020 — 2024 Completed
4 years
Framework duration
28
Mix designs assessed
None
Plant downtime caused
Project Overview

About this project

Building inside a live mining operation means the plant does not stop for you. Strobell Africa held a standing framework with Base Titanium covering foundation inspection, mix design assessment and routine materials testing across the process plant and its supporting infrastructure.

Heavy plant foundations carry dynamic loading that ordinary structural concrete is not specified for. We assessed and re-specified the mix designs for the crusher and mill bases, then verified every pour against the revised specification — including early-age strength gain, so the mechanical team could set anchors to a tested date rather than a nominal 28-day assumption.

The framework ran for four years across successive capital projects, with the laboratory holding the historical mix performance data that made each subsequent specification faster to settle.

What we delivered

  • Heavy plant foundation inspection and sign-off
  • Concrete mix design assessment and re-specification
  • Early-age strength verification for anchor setting
  • Standing routine materials QA across capital projects
Expert Consultation

Planning something similar?

Talk to the team that delivered this one. Free initial consultation, no obligation.